LONDON: Liquefied natural gas tanker Gaslog Salem is scheduled to arrive in the Netherlands on Sept. 4, the Rotterdam port authority says on its website.
The tanker is likely to load at the Gate terminal. It has a capacity of 155,000 cubic metres.
Source: Brecorder